This unit of competency specifies the outcomes required to safely install formwork, reinforcement and place and finish concrete for the construction of minor slabs, pathways and other minor works to a specified design finish.
The unit includes positioning the truck, placing concrete from truck to work area, spreading concrete and cleaning up site.
Assessment tasks will be designed to reinforce and extend knowledge and skill competence within set and controlled parameters in accordance with each unit’s learning outcomes and performance criteria requirements, including the setting of work based practical application tasks designed to provide evidence of competence outcomes, within periodic and scheduled timelines.
Students will be expected to demonstrate the following required skills:
The qualified trainer and assessor will provide teaching and learning materials as required in the form of workbooks produced by the Polytechnic and/or via the Polytechnic e-learning system.
This unit is not compulsory for any specific course. Depending on the course you study, this unit may be taken as an elective.